Little Header

Shop Capacity

   
Pipe Fabrication Shop Capacity (Total)
Man-hours per Month 16,000
Spools per Month1 4,000

 

Steel Fabrication Shop Capacity (Total)
Man-hours per Month 10,000
Tons per Month2 500

1Based on 20' spools with two welds per spool, standard weight 4" diameter pipe, non-premium time.

2Based on medium to heavy structural steel fabrication, non-premium time.

Table of Contents